The governing resource is marked available; it aligns with the selected objective; the complete reference enters the selected budget band.
Start with what your property already has.
Explore, manipulate, calculate, price, and combine nine complete energy pathways—from sunlight and wind to water, heat, biomass, motion, elevation, and coordinated hybrids.
Surplus power → water lift → stored head → generation
Tell the model what this land can actually offer.
Three quick choices rank all nine families and govern the active model. “Possible” resources are derated until measured; absent resources cannot produce fictional output.
Compatibility explains; it does not choose for you.
The governing resource is marked available; it aligns with the selected objective; the complete reference enters the selected budget band.
The governing resource is marked available; it aligns with the selected objective; the complete reference enters the selected budget band.
Nine systems. One property truth.
Select any family to open its components, property interaction, deterministic balance, constraints, failures, costs, questions, and synchronized views.
Hillside Water Storage
Store surplus energy by lifting common property water, then recover part of it through controlled descent.
The path operates, but at least one defined threshold is not met.
The pipe consumes part of the available head. Move the upper reservoir to reveal how geometry changes the complete storage loop.
Ask the questions that matter on real land.
Usable elevation, water volume, and hydraulic loss limit the autonomy window.
Planning envelopes—not quotes.
135 m³ storage, pump/turbine, conveyance, controls, and civil work; excavation and geotechnical conditions can dominate. Active component selections apply a 1× planning-cost factor.
DOE pumped-storage system boundary; property-scale quote required · 2026 · incentives excludedNothing exists as an isolated calculator.
The complete engineering package follows every change.
The interactive property is the front door. This package carries the same governed revision into equipment, budget, resilience, execution, and a portable project record.
Start with what is already available.
A free entry may provide direct service or reduce demand. It is not mislabeled as a free whole-property power system.
Use what already exists
Use an existing elevated tank, pond, spring, or cistern for gravity-fed water service and avoid pumping whenever the measured head is sufficient.
No purchased generation modeled; the benefit is avoided demand or direct service.
unknown- Existing lawful stored water above the load
- Verified containment, overflow, route, and water quality for the intended use
Gravity-fed water can avoid pumping but does not automatically provide useful electrical storage.
Survey, water storage, protected routing, measurements, and safe civil work can become part of a larger loop.
Reclaimed or assisted entry
Use existing sound tanks, pipe, and valves for a low-pressure water-transfer test with overflow, drainage, and no electrical generation claim.
Output remains unknown until the reused equipment is identified, tested, and measured.
unknown- Pressure-rated reusable components in known condition
- Safe supports, isolation, drainage, and screened intake
Unknown tanks, unsupported water mass, buried damage, and unverified pressure components are not acceptable shortcuts.
Survey, water storage, protected routing, measurements, and safe civil work can become part of a larger loop.
One-service starter
Move and release a bounded water volume through a protected route to prove head, flow, loss, and one useful direct-water task.
0 kW under the starter-scale governed inputs; infeasible against the current priority load.
calculated- Surveyed elevation and route
- Known water volume, pipe rating, safe containment, pump or recharge source, and controlled discharge
This scale is evaluated against the current 7.2 kWh target and is not a whole-property promise.
Survey, water storage, protected routing, measurements, and safe civil work can become part of a larger loop.
Expandable staged system
Install a coherent portion of the governed architecture with protected interfaces sized so later capacity can be added deliberately.
0.48 kW under the staged governed inputs; infeasible against the current priority load.
calculated- Verified site measurements
- A complete protection and isolation plan
- Compatible equipment with documented expansion limits
Future expansion is only preserved when conductors, pipes, controls, foundations, storage interfaces, and permits account for it.
The measurement record, protected routes, controls, compatible equipment, and commissioning baseline become part of the complete system.
Complete reference system
Implement the complete source-to-load architecture represented by the current canonical EnergyCircle revision.
0.69 kW; fragile against the current defined target.
calculated- Resolved unknowns and exclusion criteria
- Current local quotes and equipment data
- Required permits, inspections, and professional review
The modeled result remains a planning result until site measurements and selected equipment replace assumptions.
The complete revision becomes the commissioning baseline and maintenance record.